Projects

North Calliham-San Miguel Project

PROJECT OVERVIEW /

Maslonka’s team rebuilt 17 miles of 138kV transmission line and removed 17 miles of wood poles. The team also installed 17 miles of concrete poles and 795 ACSR conductor.

CLIENT /

South Texas Electrical Cooperative

LOCATION /

Campbelton, TX

Back to Projects