Maslonka’s team rebuilt 17 miles of 138kV transmission line and removed 17 miles of wood poles. The team also installed 17 miles of concrete poles and 795 ACSR conductor.
CLIENT /
South Texas Electrical Cooperative
LOCATION /
Campbelton, TX